At a glance

  • Assets managed

    2,000+

  • Faults repaired

    22,000+

  • Maintenance checks

    900,000+

Figures as of October 2026

Story

Background

Since 2018, Balfour Beatty's Rail Plant business has used Asset Management to manage its asset information. It was one of the first clients to adopt the system, which was originally developed around its requirements.

Previously, asset records were stored in spreadsheets and paper files across different parts of the business. The team wanted to digitise and consolidate these records so that maintenance, faults and repairs could all be managed in one system.

The team also uses RTS's Work Management and Resource Management products to plan work and crews.

How they use it

Asset Management is used across eight business units, including on-track machines, specialist plant, road rail, High Speed 1 (HS1), multi-purpose vehicles (MPV), and TRAMMs and cranes. Each business unit manages its own assets and users within the same central system.

Across the business, more than 2,000 assets spanning over 200 types are organised by class, type and model. These range from on-track machines, plant, wagons and cranes to engines, transmissions, bogies, axles, tamping banks, lifting accessories and safety systems.

Each business unit can structure its assets to reflect the equipment it manages. Some use several levels of detail, while others keep a flatter structure. Machines can be broken down as far as needed, allowing maintenance and faults to be recorded against either a specific component or the machine as a whole.

The maintenance tasks are equally flexible. Exams, daily checks and post-service inspections were configured around Balfour Beatty Rail Plant's existing processes, rather than requiring the team to change how it worked.

From 2018 to October 2026, the system recorded more than 9,000 completed maintenance jobs, over 22,000 fault repairs and more than 900,000 individual maintenance checks across the business's assets.

Maintenance planned on usage, not just dates

Maintenance can be scheduled by usage as well as by date, for example after every 10,000 engine hours. The team can enter usage readings as part of its day-to-day work, which is the approach used by most clients.

For Balfour Beatty Rail Plant, RTS developed an interface between Asset Management and the business's existing asset-tracking system. This automatically transfers usage data, including engine hours, mileage and tamping insertions, for the assets covered by the tracking system.

Other case studies

  • Painter Brothers

    Structural steel fabrication

    • Assets managed

      90+

    • Equipment types

      30+

    • Demo to go live

      3 weeks

    Figures as of October 2026

    A 6-person team tracking 90+ workshop machines, fire alarms and fire doors, live three weeks after their first demo.

    Read the case study

See how it would work for you

Book a demo, online or in person, and we'll show you Asset Management and talk through how it would fit the assets you look after.

  • Annual licence per user
  • No upfront cost
  • Support included